← All apps
Available nowiOS

Hearing Aid AI Sound Amplifier · iOS

Hearing help for iPhone and iPad, with an equalizer for each ear that AI tunes to you.

Hearing Aid AI turns your iPhone or iPad into a sound amplifier for the moments when hearing is hard work: a conversation across the table, the television at a sensible volume, a lecture from the back of the room. Put on headphones, press Start Listening, and the microphone is amplified straight into your ears — up to 40 dB, through a seven-band equalizer with a separate curve for each ear. Photograph the audiogram from your audiologist, or describe in your own words what you are missing, and the AI hearing profile sets the equalizer for you: for everyday sound, not only speech. It keeps running with the screen off, pauses during phone calls, works with wired, Bluetooth and AirPlay headphones, and a safe limit catches sudden loud sounds. Free to download, with optional Monthly, Yearly or Lifetime plans. A sound amplifier, not a medical device. On Android, see Hearing Aid Sound Amplifier.

Two iPhone screens from Hearing Aid AI: the amplifier panel with VU meters, the equalizer and the knobs, and the AI hearing profile that reads an audiogram

A closer look

Hearing Aid AI Sound Amplifier · iOS in use, screen by screen.

The amplifier panel on iPhone while listening, with both VU meters moving
Put on headphones and press Start Listening: the microphone is amplified straight into your ears, up to 40 dB.
The seven-band equalizer with the left ear selected and a dashed outline of the right ear's curve
Seven bands from 125 Hz to 8 kHz, with a separate curve for each ear — hearing loss is rarely the same on both sides.
The AI hearing profile screen with buttons to photograph an audiogram and a list of recent profiles
Photograph your audiogram or describe what you are missing, and the AI hearing profile sets the equalizer. The last three profiles are kept.
The input and output sheet with the microphone, the output device and a left–right balance slider
Wired, Bluetooth or AirPlay — with a balance control that favours the ear that needs it.
The About and tips screen with advice on getting started, feedback and the safe limit
Made to be used all day: it keeps running with the screen off, pauses during calls, and a safe limit guards your ears.

Community

Help shape Hearing Aid AI Sound Amplifier · iOS

Suggest features, report bugs, upvote what matters. Members shape every byteNine release.

Loading…